North Block, Brompton Barracks · Kent · 2026

Heritage Statement and listed building consent for refurbishing a Grade II* barracks by James Wyatt.

North Block at Brompton Barracks, Chatham, built in 1804 to 1806 and still in use as soldiers’ accommodation. Heritage Unlimited recorded the eastern half of the building room by room and window by window, and listed building consent for its refurbishment was granted with no pre-commencement conditions.

ListingGrade II*
SectorPublic
AuthorityMedway

North Block forms the long north side of the parade ground at Brompton Barracks, home of the Royal School of Military Engineering. It was built in 1804 to 1806 to the design of James Wyatt for the Board of Ordnance, in stock brick with stone dressings, and is listed at Grade II*. It stands in the Brompton Lines Conservation Area, among a group of Grade II* barracks buildings and memorials. More than two centuries on, it is still used for the purpose it was built for: living accommodation for soldiers.

Heritage Unlimited was appointed in 2025 as heritage consultant to a multi-disciplinary team led by the architects Playle and Partners, with DHA Planning as planning consultants. The first phase of work covers the eastern half of the block and its east wing: new services, heating and ventilation, fire safety upgrades, new kitchenettes, and repairs to windows, brickwork and stone. Listed building consent was granted by Medway Council in January 2026.

At a glance
Property
North Block, Brompton Barracks, Chatham
Listing
Grade II*
Location
Chatham, Kent
Authority
Medway Council
Year
2025 to 2026
Outcome
Listed building consent granted

Every room and every window.

A refurbishment that touches every room of a Grade II* building needs to be assessed room by room. The Heritage Statement was therefore supported by a gazetteer in four parts, one for each house in the first phase, recording the fabric of each room and grading its significance, and by a schedule of some forty window bays, each photographed.

The windows were dated by the profile of their glazing bars and by the presence or absence of horns, checked against a photograph of 1866, and colour-coded on the elevations as Georgian originals, two patterns of Victorian replacement, or modern. That gave the design team a clear order of priority, with the original sashes first in line for repair.

The archive, and what opening up revealed.

The research drew on the tithe map of 1840 and Ordnance Survey editions from 1865, on engravings of the 1840s and 1860s, and on the collections of the Royal Engineers Museum, including nineteenth century photographs and the drawings for a modernisation of the block in 1956.

The picture that emerged was of a building whose plan is essentially as Wyatt left it, with four rooms opening off a central stair in each house, on load-bearing masonry walls, but whose interiors are largely modern. Targeted opening-up works, notified to the council in advance, found no original lath and plaster ceilings, and the doors and partitions proved to be recent. The significance lies in the masonry walls, the surviving staircases, the exterior, and the original sash windows.

New services through old routes.

That understanding shaped the scheme. Services were routed through existing runs and penetrations, avoiding the floor joists. Kitchenettes were placed against the rear external walls. All historic masonry walls and door openings are retained, modern plasterboard ceilings are replaced with fire-rated ones, and modern doors give way to panelled fire doors. We attended the design team meetings throughout, and met the council’s conservation and planning officers on site before the application was made.

The Heritage Statement concluded that harm would be less than substantial and at the lower end of that scale, confined to new penetrations for services, and outweighed by the benefit of keeping the building in its original use and in good repair.

Listed building consent (MC/25/2122) was granted on 29 January 2026 with four conditions, none of which had to be discharged before work could begin. The Heritage Statement, gazetteer and window schedule are named on the decision notice. We have continued to advise during the works, including on scaffolding fixed through window openings so that no ties needed to be drilled into the brickwork.

Refurbishing a listed building in daily use?

Tell us about your project.

We work as heritage consultant within design teams on listed public and institutional buildings across England and Wales. Send us the details and you will have a response within one working day.

What to send

To get a fast outline approach, share:

  • The address of the property and its grading, if known
  • A short description of the proposed works
  • Where you are in the planning process
  • Your role: owner, developer, architect, or public body