Listed building consent, prepared by specialists.
Listed building consent is required for any work that affects the character of a listed building, inside or out. We prepare the application, write the supporting heritage impact assessment, and liaise with the local authority on your behalf, so the case for consent is made clearly the first time.
We respond within one working day with no obligation listed building consent advice and an outline approach.
Listed building consent is a legal requirement under the Planning (Listed Buildings and Conservation Areas) Act 1990. Any alteration, extension or demolition that affects the character of a listed building, of any grade, requires consent before work begins.
Most listed building consent applications also require planning permission. We work alongside your architect or planning consultant to make sure both run in step.
When you need it
The works that require consent.
Internal alterations
Removing internal walls, replacing fireplaces, altering staircases, modernising kitchens or bathrooms in a listed property all require consent. Internal features are protected, regardless of whether they are mentioned in the listing description.
External alterations
Replacing windows or doors, repointing in a different mortar, adding rooflights, repainting in non-historic colours, installing solar PV or air source heat pumps. The threshold is whether the work affects the character of the building, not whether it is visible from the street.
Extensions & demolition
Extensions to listed buildings, whether attached or in the curtilage, almost always require consent. Demolition of any part of a listed building, including curtilage structures, requires consent in nearly every case.
What we provide
A complete listed building consent service, start to finish.
1.
Pre-application heritage advice
Before any application is submitted, we assess the property, its grading, and the proposed works. You receive a written view on what is likely to be approved, what is likely to be contested, and what would benefit from a pre-application discussion with the local authority.
2.
Heritage impact assessment
Every listed building consent application is supported by a heritage impact assessment that sets out the significance of the building, the impact of the proposed works, and the justification for any harm. We write the statement to the standard the NPPF and Historic England expect.
3.
The application itself
We prepare and submit the listed building consent application, including drawings, photographs, and any supporting documents the local authority requires. Where planning permission is also needed, the two are submitted in parallel.
4.
Liaison and discharge of conditions
We respond to the local authority’s queries, attend site meetings if required, and handle any conditions attached to the consent through to discharge.
What to expect
From instruction to decision.
i.
Preparing the application
Once instructed, we usually start within two weeks, and often sooner. A straightforward application is typically ready to submit within a week; more complex works, which may need drawings and reports from other specialists, typically take around four weeks.
ii.
The council’s decision
Once the application is validated, the local authority has a target of eight weeks to decide it. We act as your agent throughout, answering the conservation officer’s queries so the application keeps moving.
From instruction to decision, most listed building consent applications take around 12 weeks. Grade I and Grade II* buildings, and schemes that need input from other consultants, can take longer. We give you a project-specific timeline after the initial review.
The application that gets approved is the one that’s properly prepared.
What we provide
A listed building consent secured.
Nash Court
A Queen Anne house of 1713 in Kent. A plan for restoring its conservatory and barn.
A Conservation Management Plan for the partly collapsed conservatory and former stables at Nash Court, a Grade II* listed house of 1713 near Boughton under Blean, requested by Swale's conservation officer and issued in March 2022 with our heritage statement for the house.
Read the full project →Browse listed building consent projects by
Get listed building consent advice
By submitting this form you agree to be contacted about your enquiry. We don’t add you to mailing lists, and we don’t share your details. Read our privacy policy.
Common questions
Listed building consent FAQs.
Do I need listed building consent for internal works?
What happens if I do work without consent?
Does Grade II need the same level of detail as Grade I?
Do I also need planning permission?
How long does listed building consent take?
Do you provide a fee estimate before we commit?
Get in touch
Tell us about your project. We’ll tell you what’s involved.
A short conversation is usually enough to confirm what’s needed, what it costs, and what comes next. We respond to most enquiries within 24 hours. Working in London? Meet our heritage consultants in London.
To get a fast outline approach, share:
- The address of the property and its grading, if known
- A short description of the proposed works
- Where you are in the planning process
- Your role: owner, developer, architect, or public body