Heritage Consultancy Services · Historic Building Recording
Historic building recording, to Historic England standards.
Historic building recording is often required as a condition of planning or listed building consent, a written, photographic, and drawn record of a building before works alter it. We carry out recording at Levels 1 to 4, to the standard Historic England sets out, and submit the report to your local authority to discharge the condition.
We respond within one working day leading to a no obligation outline approach.
Most local authorities now attach a building recording condition to consents that involve significant alteration or demolition of historic fabric. The condition typically requires a Level 2 or Level 3 record, prepared in line with Historic England’s Understanding Historic Buildings guidance, submitted before works start.
We deliver the record, get it approved by the local authority, and discharge the condition so works can begin on programme.
When recording is required
When historic building recording applies.
As a planning condition
Most commonly, recording is a condition of consent. The decision notice will specify the level required, typically Level 2 or Level 3, and the trigger point, usually before works commence. We deliver the record and submit it formally for the condition to be discharged.
For demolition and substantial alteration
Where a building is being demolished, substantially altered, or where significant fabric is being removed, recording captures the evidence before it is lost. This is good practice regardless of whether a condition has been imposed.
For research and archive purposes
Owners of significant historic buildings sometimes commission recording independently, for the family archive, for the building’s own records, or to inform future management. The principles are the same; the audience is different.
What’s in the record
Recording at the right level.
1.
Level 1, basic visual record
A short descriptive and photographic record: the building in its setting, key elevations, principal features. Used where the building is of low significance or where the works have minimal impact.
2.
Level 2, descriptive record
A more comprehensive description, photographic record, and analysis of plan form. Most planning conditions require Level 2 or Level 3.
3.
Level 3, analytical record
A detailed account of the building including measured plans and elevations, a phased history, and analytical interpretation. Required for buildings of substantial significance or where alteration is extensive.
4.
Level 4, comprehensive analytical record
The most thorough level, for nationally important buildings, complex sites, or where the recording itself is the primary purpose. Includes archive research, full measured survey, and a substantial written interpretation. We also deposit the record with the relevant Historic Environment Record and, where appropriate, the Royal Commission archive.
What to expect
From instruction to discharge.
i.
Level 2 and Level 3 records
For a typical Level 2 record on a residential or small commercial building, three to four weeks from instruction to a final report. A Level 3 record, with measured drawings and archive research, runs to five to eight weeks. Level 4 is project-dependent and agreed at the outset.
ii.
Discharge of the condition
We submit the record formally to the local authority. Most discharge a recording condition within four to eight weeks of submission. We chase actively if the timeline is tight against your construction programme.
Tell us your construction start date and we’ll work back from it.
Recording captures the evidence before it is lost.
Recent work
A historic building record that discharged the condition.
Level 3 record on a Grade II listed property
Measured survey, phased history and analysis, submitted to discharge a planning condition.
A Level 3 historic building record on a Grade II listed property, prepared to Historic England standards and submitted to the local authority to discharge a building recording condition before works began.
View our work →Browse historic building recording projects by
Common questions
Historic building recording FAQs.
What level of recording does my planning condition require?
When does the recording need to be done, before or after works?
How long does it take to discharge a building recording condition?
Who can carry out building recording?
Where does the record get deposited?
How much does building recording cost?
Get in touch
Tell us about the building. We’ll tell you what’s involved.
Most enquiries get a written outline approach within 24 hours. Working in London? Meet our heritage consultants in London.
To get a fast outline approach, share:
- The address of the building
- The planning condition wording, if you have it
- Your construction start date
- The level of recording required, if known