Solar panels on a listed building need listed building consent, and since 27 August 2026 the planning permission route has tightened too. We prepare the heritage case that gets well-sited, well-designed installations consented.
We respond within one working day leading to a no obligation outline approach.
Solar on a listed building is not impossible. It is a question of evidence. Applications succeed when they show what is significant, where the panels go, how little they change the building and how they can be removed. We prepare that case, working alongside your installer or architect, and put it to the conservation officer.
We recently secured consent for solar panels on a Grade II listed building in Sevenoaks, on a scheme that had been assumed to be unconsentable.
When you need consent
When solar on a listed building needs consent.
Roof and wall-mounted panels
Panels on a listed building, or on a building within its curtilage, need listed building consent. Since 27 August 2026, solar equipment on a listed dwelling or block of flats is also no longer permitted development, so planning permission is needed as well, subject to a transitional period.
Ground-mounted arrays
Arrays within the curtilage of a listed building remain outside permitted development altogether. The heritage case has to address the setting of the building as well as its fabric, and siting, height and screening all matter.
Plug-in and balcony solar
Plug-in solar kits are now caught by the same restrictions, even though no installer is involved. On a listed building they need permission, and they cannot be fixed to timber walls, balconies, cladding or fences.
What’s in the package
Heritage advice for your solar installation.
1.
Pre-application heritage advice
Before you commission a design, we tell you whether solar is likely to be acceptable on your building, where on the roof or site it could go, and what the conservation officer will be looking for. It saves redesign cost.
2.
Heritage impact assessment
The supporting document for your listed building consent application. It sets out the significance of the building, the proposed installation, the effect on its character and setting, and how harm is avoided or minimised.
3.
Siting and product advice
We work with your installer or architect on panel position, array layout, in-roof and solar slate alternatives, colour and finish, and reversible fixings, so the design reflects what consent officers respond to.
4.
Consent route and liaison
We work out which consents you need, prepare and submit the listed building consent application, and coordinate a planning application where one is also required. We handle the conversation with the conservation officer.
What to expect
From instruction to submission.
i.
Typical residential application
For a typical residential listed building application, we work to a three to four week timeline from instruction to submission. Site visit and research first, draft and refinement, then delivery alongside the application package.
ii.
Larger or complex projects
Larger arrays, ground-mounted schemes, or a Grade I or Grade II* building sit in the four to six week range. We agree the timeline at the outset.
The council’s determination period is separate. Tell us what you’re working to and we’ll tell you what’s realistic.
The obstacle is very rarely the principle of renewable energy. It is the quality of the analysis behind the application.
Recent work
Solar on a Grade II listed building.
Solar panels on a Grade II listed building
A scheme assumed to be unconsentable, consented.
Heritage Unlimited prepared the heritage case for solar panels on a Grade II listed building in Sevenoaks, Kent. The scheme had been assumed to be unconsentable. A well-evidenced application, built on an analysis of significance, siting, reversibility and visual impact, secured consent.
Read the case study →Browse projects by
Common questions
Solar panels on listed buildings FAQs.
Can I put solar panels on a listed building?
Do I need planning permission as well as listed building consent?
Can I have ground-mounted solar in the garden of a listed building?
What about solar panels in a conservation area?
Do plug-in or balcony solar kits need permission?
Are in-roof panels or solar slates more acceptable?
Get in touch
Tell us about the building. We’ll tell you what’s involved.
Most enquiries get a written outline approach within 24 hours. Working in London? Meet our heritage consultants in London.
To get a fast outline approach, share:
- The address of the building and its listing grade
- Where the panels would go: roof slope, wall or garden
- Whether you already have an installer or a design
- Your role: owner, developer, architect, or public body