Listed Building Consent

Section 26H certificates: a faster, fee-free route to certainty

Not every change to a listed building needs consent. How a section 26H certificate of lawfulness settles the question, shown through a recent case at Jenner Court, Colindale, and the limits every owner should know.

PublishOctober 2026
CategoryListed Building Consent
Reading time3 minutes
AuthorPaul Clarke

Owners of listed buildings are often told that almost any change needs listed building consent. The law is narrower than that. Section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 requires consent only for works that would affect the character of the building as a building of special architectural or historic interest. Section 26H gives owners a way to have that question settled formally, through a certificate of lawfulness of proposed works. A certificate our heritage consultants in London recently secured for a flat at Jenner Court, Colindale shows how the route works.

The building

Jenner Court is the former administrative block of Colindale Hospital, dated 1899 and listed Grade II. Its list entry describes the windows in unusual detail: 9/9 and 6/6 horned sashes, and arched second floor casements with glazing bars beneath vaned overlights. The building was converted to nine flats under listed building consents granted in 2009 and 2012, and the 2012 consent approved a window by window specification with slim-profile sealed double glazed units.

The heritage challenge

By 2026 the sealed units in one flat had failed. The hermetic seals had broken down and the glass in fourteen windows had clouded. The owner wanted to replace the units like for like. Because the list entry dwells on the windows, it was not obvious that consent could be avoided, and carrying out works that need consent without it is a criminal offence.

Our approach

A section 26H application turns on one question: would the works affect the character of the building as a building of special architectural or historic interest? We inspected every affected window and prepared a Statement of Significance and Reasons that read the list entry on its own terms. What the entry values is the configuration of the openings, the horned sashes, the glazing bars and the timber joinery. It says nothing about the glass. The 2012 consent record dated the units and showed that the Conservation Officer had placed the value of the windows in their joinery. The replacement units were specified to match the approved 2012 units exactly.

The outcome

The London Borough of Barnet issued the certificate on 23 October 2026, four weeks after the application was registered. Its reasons record that the works would not affect the character of the listed building as a building of special architectural or historic interest and do not require listed building consent. The full case is on our Jenner Court project page.

Why a certificate of lawfulness is worth considering

  • There is no application fee.
  • The decision is not discretionary. If the evidence satisfies the Council that the works are lawful, section 26H(3) requires it to issue the certificate. There is no policy balance and no debate about design.
  • The works are conclusively presumed to be lawful, which protects the owner from enforcement and gives a clear record for a managing agent or a future buyer.
  • The Regulations set a six week determination period.

The limits of a certificate

The limits matter as much. A certificate covers only the works it describes. It cannot be granted for works already carried out, so nothing should start until it is issued. And the timing works differently from a consent. With planning permission or listed building consent, work only has to begin within three years, and once begun the consent has no end date. The works covered by a certificate must be completed within ten years of its issue, after which a fresh application is needed.

How we can help

Heritage Unlimited provides expert heritage and planning advice for listed buildings, conservation areas and sensitive historic environments across England. If you are unsure whether the works you have in mind need listed building consent, we would be glad to help.

Get in touch or call 0330 0880 984.

Header photo: Heritage Unlimited, Jenner Court, Colindale.

In this article

    Get in touch

    Tell us about your project. We’ll tell you what’s involved.

    A short conversation is usually enough to confirm what’s needed, what it costs, and how the work is best routed. Most enquiries receive an outline approach within 24 hours.

    What to send

    To get a fast outline approach, share:

    • The address of the property and its grading, if known
    • A short description of the proposed works
    • Where you are in the planning process
    • Your role: owner, developer, architect, or public body